TM 11-7025-210-23
Index of Maintenance Procedures -- Continued
Paragraph No.
Title
Page No.
Remove/Replace Power Supply Capacitors and Reactor
Remove/Replace Power Supply (XPS) Board
Remove/Replace RUN/LOAD Switch
Remove/Replace Control Panel (LCP) Board
Remove/Replace VFU Assembly
Adjust VFU Assembly
Section I. REPAIR PARTS, SPECIAL TOOLS,
TMDE AND SUPPORT EQUIPMENT
4-1.
COMMON TOOLS AND EQUIPMENT
For authorized common tools and equipment, refer to the Modified Table of Organization and Equipment (MTOE)
applicable to your unit.
4-2.
SPECIAL TOOLS, TMDE, AND SUPPORT EQUIPMENT
Refer to TM 11-7010-203-23P for a complete listing and description of special tools, TMDE and support equipment
required by direct support maintenance.
4-3.
SPARES AND REPAIR PARTS I
Refer to TM 11-7010-203-23P for a complete listing and description of spares and repair parts required for direct support
maintenance of this equipment.
Section II. TROUBLESHOOTING
4-4.
GENERAL
The most effective way to find a fault in this equipment is to follow a routine which guides you through the five phases of
troubleshooting (fig. 4-1). By following this routine you assure accurate use of fault isolation and fix procedures. You also
improve your troubleshooting skills.
4-5.
TROUBLESHOOTING PHASES
Each of the five phases in this routine is designed to accomplish a specific goal.
a.
Fault Discovery. Usually, the operators or supervisor will notice faulty performance first. They must report the
fault on the proper form so you will have the facts you need for the next phase.
4-2