TM 5-3610-295-13&P-2
5-11. MAIN POWER RECEPTACLE ASSEMBLY. - Continued
b.
Replace. - Continued
(7)
Remove receptacle box (9) from shelter wall.
(8)
Remove data plate (10) (power requirements) from receptacle box by drilling out rivets (11).
(9)
Position data plate (10) (power requirements) on receptacle box (9), match drill holes, and secure with
rivets (11).
(10)
Position receptacle box (9) in shelter wall opening and secure with rivets (8).
(11)
Install gasket (7), main power receptacle (6), and cap (5).
(12)
Install screws (4), flat washers (3), lockwashers (2), and nuts (1).
(13)
Install conduit bushing (5, Figure 5-2) and conduit nut (4).
(14)
Solder four main electrical wires to terminals in the main service assembly. Install tie wraps as
necessary.
(15)
Position receptacle access plate on receptacle box (2) and secure with screws (3).
(16)
Position door and cover assembly (2, Figure 5-4) on service box and secure with screws (1).
c.
Repair. (See Figure 5-2 and figure 5-3.)
Repair of the main power receptacle consists of replacement of receptacle and cap, gasket, and wiring as
necessary.
5-15