TM 5-3610-294-13&P
2-13. ASSEMBLY AND PREPARATION FOR USE. -Continued
(13)
Place all circuit breakers and switches on the Power Distribution Panel inside the shelter in the ON
position.
(14)
Place ON/OFF switch on emergency light in ON position.
(15)
Install flexible duct between air conditioner assembly vent and rear shelter wall.
(16)
Verify that cargo door vent assemblies are open and energize air conditioner units and set controls
(Heating or Cooling) to desired positions.
(17)
Refer to TM 5-3610-299-12&P Paper Cutter Operations and Maintenance manual and energize the Paper
Cutter.
2-14. PREPARATION FOR MOVEMENT.
WARNING
Never connect or disconnect any power cables when electrical power is energized to the cables. Failure to do so
will result in damage to equipment and/or serious injury or DEATH to personnel.
a.
Place all ON/OFF power switches on all operating equipment in the shelter in the OFF position.
b.
Place all circuit breakers and switches on the Power Distribution Panel in the shelter in the OFF position.
c.
Notify personnel in all shelters that power will be shut off, and place main circuit breaker on Power Distribution
Box in OFF position.
d.
Notify generator operator to shut down power source and disconnect and stow power cable.
e.
Disconnect power cable between the Power Distribution Box Assembly and the Finishing Section shelter. Roll
power cable and place in storage compartment behind cargo doors under AC units. Stow power distribution box
in storage location next to islatrol control box. Disconnect grounding rod wire, remove grounding rod, and stow in
storage rack.
f.
Return all tools, and materials and other small items to their proper storage locations.
2-28
