TM 5-3610-294-13&P
2-14. PREPARATION FOR MOVEMENT. -Continued
(6)
Place paper storage rack with red dot in position over the red dot on the shelter floor.
(7)
Place the platemaker with blue dot in position over the blue dot on the shelter floor.
(8)
Place developing tray with brown dot in position with the brown dot on shelf table and secure with rubber
ropes.
(9)
Place stools, tool box and waste can in storage locations shown in Figure 2-16 and secure in place with
rubber tie downs. Remove flexible air conditioner duct and stow inside waste can.
Figure 2-16. Finishing Section Equipment Storage Location
j.
Strike the Finishing Section Shelter. Refer to TM 10-5411-200-14 for striking procedures.
2-30 Change 1