TM 5-3610-294-13&P
2-12. INTRODUCTION. -Continued
Table 2-1. Operator Preventive Maintenance Checks and Services (PMCS) (Continued)
B - Before
D - During
A - After
Interval
Item
Item To Be Inspected
Equipment Is Not Ready
No. B D A
Procedure
/Available If:
3
Hygrometer and Temperature Indicator -
Visual Inspection
1.
Inspect cover for damages.
Cover damaged.
2.
Inspect temperature gauge for damages.
Temperature gauge cracked or broken.
4
Islatrol Control Box-Visual Inspection.
1.
Check cover for damages and loose or
Cover is damaged or hardware is loose or
missing hardware
missing.
5
Paper Cutter-Visual Inspection (Note: Refer to
TM 5-3610-299-12&P for PMCS procedures.)
1.
Inspect guard for damage and loose hardware.
2.
Remove guard and wipe shelf with damp cloth.
6
Phase Monitor Meter
1.
Inspect cover for damages.
Cover is dented or damaged.
2.
Check switches for damages.
Switches not operating.
.
2-17