TM 5-3610-294-13&P
2-12. INTRODUCTION. -Continued
Table 2-1. Operator Preventive Maintenance Checks and Services (PMCS) (Continued)
B - Before
D - During
A - After
Interval
Item
Item To Be Inspected
Equipment Is Not Ready
No. B D A
Procedure
/Available If:
1
Power Distribution Panel - Visual Inspection
Damaged, missing or loose
WARNING
High Voltage exists in the electrical system of this
equipment. DEATH on contact may result if personnel
fail to observe safety precautions.
1. Inspect for damage to door and panel.
Door or panel damaged.
2. Inspect circuit breakers for operation, condition
Circuit breakers not operating
and security.
2
Emergency Light-Check operation of light.
1. Test battery by operating test switch with ON/OFF
Lights do not operate when test switch is
switch in ON position.
activated.
2. Check Ready Light.
Ready light does not operate when circuit
breaker switch is turned ON.
3. Check light bulbs for operation with ON/OFF
Lights do not operate when test switch is
switch in ON position.
activated.
2-16
