TM 5-3610-294-13&P
4-23. POWER DISTRIBUTION BOX ASSEMBLY. - Continued
f.
Repair by replacing Phase Light, Power Distribution Box Assembly. (See figure 4-24.) This procedure
applies to both the correct and incorrect phase lights.
(1)
Request generator operator shut down generator and disconnect main power cable (1).
(2)
Raise control panel cover (2) and request Module C supervisor place circuit breaker (3) in OFF
position.
(3)
Remove control panel assembly (4). (See a. above).
(4)
Tag and unsolder terminal wires (5) from phase light (6).
(5)
Remove nut (7) and phase light (6).
(6)
Place replacement phase light (6) in position and secure with nut (7).
(7)
Solder terminal wires (5) to phase light (6) and remove tags.
(8)
Secure control panel assembly (4) to power distribution box assembly (8). (See a. above.)
(9)
Request generator operator connect main power cable (1), and turn on generator. Test
operation, and request Module C supervisor place circuit breaker (3) in ON position.
Figure 4-24. Replacing Phase Light, Power Distribution Box Assembly
4-54