4-23. POWER DISTRIBUTION BOX ASSEMBLY. - Continued
b. Repair by replacing Fuse Holder, Power Distribution Box Assembly. (See figure
4-20.)
(1) Request generator operator shut down generator and disconnect power cord (1). Raise control panel
cover (2), request Module C supervisor set circuit breaker (3) to OFF, and remove control panel assembly (4). (See 4-
23a. above).
(2) Tag and unsolder wires (5) and remove nut (6).
(3) Remove fuse holder (7).
(4) Position replacement fuse holder (7), secure with nut (6), solder wires (5) to replacement fuse holder (7),
and remove tags.
(5) Install fuse in replacement fuse holder (7).
(6) Secure control panel assembly (4) to power distribution box assembly (8). (See 23a. above).
(7) Request generator operator connect input power cable (1).
(8) Request generator operator turn on generator.
(9) Request Module C supervisor place circuit breaker (3) in ON position and test operation.
Figure 4-20. Replace Fuse Holder, Power Distribution Box Assembly