TM 5-3610-294-13&P
4-23. POWER DISTRIBUTION BOX ASSEMBLY. - Continued
(8)
Position circuit board (11) on control panel assembly (4) and secure with lockwashers (10) and
screws (9).
(9)
Solder wires (5) to phase lights (6) and wires (7) to test switch (8) and remove tags.
(10)
Secure control panel assembly (4) to power distribution box assembly (15). (See 23a. above.)
(11)
Request generator operator connect main power cable (1), and turn on generator. Test
operation, and request Module C supervisor place circuit breaker (3) in ON position.
Figure 4-23. Replacing Circuit Card Assembly, Power Distribution Box Assembly
4-53