TM 5-3610-293-13&P
2-13. INTRODUCTION. - Continued
Table 2-1. Operator Preventive Maintenance Checks and Services (PMCS) (Cont.)
B - Before
D - During
A - After
Interval
Item
Item To Be Inspected
Equipment is not
No.
B
D
A
Procedure
Ready/ Available if:
12
Air Conditioner Housing
Assembly
1.
Inspect vent assembly for
Vent door will not open
loose or missing
properly.
hardware.
2.
Inspect vents for dents or
Vents are dented or bent.
damages.
3.
Inspect filters for
Filters are clogged with
cleanliness.
dirt.
13
Ink Cart and Tool Caddy
1.
Inspect hinges for loose
Doors fail to open
or missing hardware.
properly.
2.
Inspect door latch for
Door latch broken or
broken handle or loose
mounting hardware
missing hardware.
missing.
3.
Inspect transporter
Transporter assembly
assembly for ease of
broken or damaged.
operation.
14
GTO Cabinet Assembly
1.
Inspect light assembly for
Light does not operate
proper operation.
when switch is turned
ON.
2.
Inspect transporter
Transporter assembly
assembly for ease of
broken or damaged.
operation.
2-24
