TM 5-3610-293-13&P
2-13. INTRODUCTION. - Continued
Table 2-1. Operator Preventive Maintenance Checks and Services (PMCS) (Cont.)
B - Before
D - During
A - After
Interval
Item
Item To Be Inspected
Equipment is not
No.
B
D
A
Procedure
Ready/ Available if:
3
Hygrometer and Temperature
Indicator -
Visual Inspection
1.
Inspect cover for damages.
Cover damaged.
2.
Inspect temperature gauge
Temperature gauge cracked
for damages.
or broken.
4
Islatrol Control Box - Visual
Inspection.
Check cover for damages and
Cover is damaged or
loose or missing hardware.
Hardware is loose or
missing.
5
Printing Press - Visual
Inspection (Note: Refer to TM
5-3610-304-10 for PMCS
procedures.)
6
Phase Monitor Meter
1.
Inspect cover for damages.
Cover is dented or
damaged.
2.
Check switches for damages.
Switches not operating.
3.
Check meters for proper
Meters do not register.
operation.
4.
Check indicator lamps for
Lamps do not light.
proper operation
2-21