TM 5-3610-295-13&P-2
4-10.
UNIT TROUBLESHOOTING. - Continued
TABLE 4-3. UNIT TROUBLESHOOTING - Continued
MALFUNCTION
TEST OR INSPECTION
CORRECTIVE ACTION
5.
AIR CONDITIONER ASSEMBLY DOES NOT OPERATE PROPERLY.
Step 1. Inspect air conditioner for proper operation.
Refer to TM 5-4120-378-14.
Replace air conditioner. (See paragraph 4-21b.)
6.
BLACKOUT WARNING ASSEMBLY DOES NOT OPERATE PROPERLY.
Step 1. Check blackout assembly switch for proper operation.
Replace switch. (See paragraph 4-24b.)
Step 2. Check warning buzzer for proper operation.
Replace warning buzzer. (See paragraph 4-24b.)
7. CEILING LAMP ASSEMBLY DOES NOT OPERATE PROPERLY.
Step 1. Inspect lamp assembly for security of mounting.
Mount lamp assembly. (See paragraph 4-30b.)
Step 2. Inspect fluorescent tubes for discoloration or failure.
Replace fluorescent tubes. (See paragraph 4-30b.)
Step 3. Check lamp assembly tube sockets for damage and ability to hold tubes securely.
Replace lamp assembly. (See paragraph 4-30b.)
4-16