TM 5-3610-295-13&P-23-3. GENERAL. - ContinuedTable 3-1. Operator TroubleshootingMALFUNCTIONTEST OR INSPECTIONCORRECTIVE ACTIONNO ELECTRICAL POWER TO SHELTER SYSTEM.WARNINGThe 15 KW generator must be shut down or the main circuit breaker on powerdistribution box must be in the OFF position before connecting main power cable.Failure to do so may result in DEATH or serious injury.When used with the Modular Printing System, to ensure safety of operator, only theModule C supervisor is authorized to operate controls of the power distribution box.CAUTIONConnect the primary power cable to the input power receptacle located near the doorof the shelter. The cable connector and the receptacles are keyed to ensure properconnection.Step 1. Check that the main power cable is correctly connected at main power receptacle.Step 2. When used with the Modular Printing System, check to see if the main power cable is properly connectedat power distribution box. Request Module C supervisor verify connection and operation of the power distribution box.Step 3. Inspect to see that the generator is operating properly.Start the 15 KW power plant in accordance with TM 5-6115-464-14&P or TM 5-6115-625-14&P.2. NO ELECTRICAL POWER AT EQUIPMENT RECEPTACLES.Step 1. Check to see if applicable circuit breaker is in the ON position.Set applicable circuit breaker to ON.3-4
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business