TM 5-3610-295-13&P-1
4-33. AIR CONDITIONER ASSEMBLY. - Continued
b. Replace Air Conditioner. - Continued
(34) Attach sling (1) to air conditioner (2) as shown in Figure 4-42. Attach sling (1) to forklift.
(35) Coat the face of the collar (7) that mates with the outer frame (10) with RTV sealant (3, Appendix E).
(36) Raise air conditioner (2) and position into outer frame (10).
(37) Secure air conditioner (2) to outer frame (10) with flat washers (6), lockwashers (5), and nuts (4) and remove sling
(1).
(40) Connect power cable (3, Figure 4-39) to air conditioner and shelter receptacle.
(41) Install cable clamps (2) with screws (1).
(42) Install screws (1, Figure 4-40) on curbside air conditioner.
(43) Test air conditioner operation (refer to TM 5-4120-378-14).
(44) Set air conditioner controls to OFF and install cover (1, Figure 4-41).
This task covers:
a. Inspect
b. Replace
c. Repair
INITIAL SETUP
Tools
Electrical equipment tool kit
Materials
4-103