TM 11-6730-235-12
CHAPTER 5
SHIPMENT AND UMITED STORAGE
numbers of these materials.
5-1.
Preparation for Shipment
Material
Quantity
a. Check the components of the projector set
Waterproof paper .........................................
36 sq ft
against the basic issue hems list (app B).
Waterproof tape ...........................................
15 ft
b. Insure that the top plate assembly is secured to
Corrugated cardboard ..................................
36 sq ft
the case assembly by the spring lock button (fig. 1-1).
Adhesive tape ..............................................
15 ft
c. Lower the focusing arm holster to its lower limit
Filler material................................................
6lb
stop with the focus knobs.
b. Packaging. If the original packaging material is
d. Place the projector set components in the
available, use it to repack the projector set. If the original
carrying case (fig. 1-1).
packing material is not available, or has been damaged,
5-2.
Shipment
proceed as follows.
(1) Wrap the projector set in waterproof paper and
The shipment instructions contained herein are limited to
seal it with waterproof tape.
repackaging procedures.
The exact procedure for
(2) Place the wrapped projector set within a wrap of
repackaging depends on the materials available and the
corrugated cardboard and secure it with adhesive tape.
conditions under which the projection set is to be shipped
c. Packing. Place the packaged projector set in a
or stored. Adapt the procedures listed below whenever
wooden box. Fill any voids between the projector set
possible. Refer to the original packaging information
and the sides of the box with filler material. Nail the
(para 2-1 and fig. 2-1) as a
source of
additional
wooden box closed.
information.
a. Required Material. The materials listed below
5-3.
Administrative Storage
are required for the repackaging of the projector set.
Administrative storage of the projector set will be
Consult SB 38-100 for the National stock
Change 2 5-1