CHAPTER 7
SHIPMENT AND LIMITED STORAGE AND DEMOLITION
TO PREVENT ENEMY USE
Section I. SHIPMENT AND LIMITED STORAGE
64. Disassembly for Storage or Shipment
When the equipment is to be stored or reshipped, proceed as follows :
a. Remove the projection-head assembly by racking it to its maxi-
mum height and lifting it off the support post.
b. Remove the support post by turning the clamping knob counter-
clockwise one or two turns; then lift the support post from the hole
in the top of the housing.
c. Remove the power cable from the receptacle connector on the
front of the projector housing.
65. Repackaging for Storage or Shipment
a. Place the different components and accessories in the carrying
figure 5. Close the cover and secure
the two fasteners.
b. Repack the equipment according to the instructions in para-
graph 8.
Section II. DEMOLITION TO PREVENT ENEMY USE
66. General
The demolition procedures given in paragraph 67 will be used to
prevent the enemy from using or salvaging the equipment. Demoli-
tion of the equipment will be accomplished only upon order of the
commander.
TAGO 4738B
67