TM 10-3610-203-14
(6)
Install modified conveyer cover panel.
WARNING
The duplicating machine weighs approximately 650 pounds (295 kilograms). Extreme care should
be taken in handling the machine to prevent injury to personnel and damage to other equipment in
the shelter.
(7)
Carefully install duplicating machine in shelter and position machine over shelter floor plate mounting
points. (See fig. 5-10.)
(8)
Open cabinet doors on operator's side of duplicating machine to obtain access to machine interior.
(9)
Apply Grade C Locktite sealant, Specification MIL-S-22473 to bolts and install bolts and washers to secure
duplicating machine to floor plate mounting points.
(10)
Position upper and lower support brackets on shelter wall mounting points and mark bracket attachment
locations on duplicating machine panels.
(11)
Using appropriate tools, drill support bracket attachment holes in duplicating machine.
(12)
Install the screw and washer which attach the upper support bracket to the duplicating machine. (See fig.
5-9).
(13)
Install the screw, washer and nut attach- ing the lower support bracket to the duplicating machine.
(14)
Install the screws and washers which attach the support brackets to the shelter wall.
(15)
Install the receding stacker as follows:
(a)
Remove paper receiver from duplicating machine.
(b)
Remove left side and right side covers from duplicating machine. (See figs. 5-5 and 5-6).
(c)
Loosen the screws (12, fig. 5-5) and washers (13) at the top and the bottom of stacker left cover
panel (14).
(d)
Loosen the screws (8, fig. 5-6) and washers (9) at the top and bottom of stacker right cover panel
(10).
(e)
Using a suitable punch, remove the pin attaching the speed control knob to the speed control shaft.
(See fig. 5-13). Remove the knob.
Figure 5-13. Speed Control Knob Removal
5-19