TM 10-3610-202-14(6)Remove the storage compartment.c.Installation To install the storage compartmentproceed as follows:(1)Place storage compartment againstshelter wall and align mounting holes.(2)Secure with blind rivets.(3)Move composing machine and standassembly against shelter wall and align mounting holes.(4)Install two mounting bolts.d.Repair.Repair of the storage compartmentconsists of removing minor dents.a.InspectionInspect the wall cabinet assemblyas follows:(1)Inspect cabinet for dents or cracks andany other signs of structural damage.(2)Inspect welded areas for breaks orseparation of weld seams.(3)Inspect cabinet handles for security ofinstallation and damage. Repair or replace asnecessary.(4)Inspect paintwork for any signs of peelingor cracking and check cabinet for evidence ofenvironmental damage.(5)Inspect cabinet assembly for4-20. Wall Cabinet Assembly.The wall cabinet assembly is a two-shelf unit ofmetal construction mounted on the left-hand walltowards the front of the shelter. Two hinged doors withcontrol rod type latches provide access to the cabinetinterior. Removable steel rods extend above andparallel to the shelves to help retain cabinet contents.Two rubber protective guards are installed on the lowerfront corners of the cabinet. (See fig. 4-10.)security of mounting. Repair as necessary.(6)Inspect shelves for bends, cranks or otherdamage.(7)Inspect content retaining rods for damageand security of installation. Repair or replace asnecessary.(8)Inspect latching mechanism and latchingrods for freedom of movement, security of installationand signs of damage. Repair or replace as necessary.(9)Inspect doors and hinges for freedom ofmovement and damage. Replace as necessary.(10)Inspect rubber guard protector for4-28Figure 4-10. Wall Cabinet assembly
Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business