TM 5-3610-295-13&P-1
2-14
ASSEMBLY AND PREPARATION FOR USE. - Continued
j.
Start Procedure. Starting the System.
NOTE
When used in conjunction with Modular Print System, to ensure safety of
operator, power to circuit breaker is controlled by Module C supervisor.
(1)
Set commercial power breaker to ON or start the 60 kW power plant in accordance with TM 5-6115-
594-14&P.
(2)
Set all circuit breakers in the main power service box to ON.
(3)
Set fluorescent light switches to on.
(4)
Set the air conditioner controls for the desired mode of operation temperature setting.
2-15.
PREPARATION FOR MOVEMENT AND STORAGE.
a.
Preparing Shelter for Movement.
(1)
Secure all expendable materials and supplies. Stow all loose supplies.
(2)
Secure telephone in telephone bracket with shipping clamp.
(3)
Secure red shipping bracket to top of light table.
(4)
Be sure lock bar is installed in historical file cabinet.
(5)
Secure folding artist shelves in upright position with red shipping brackets.
(6)
Close and secure wall cabinet and artist supply cabinet doors.
(7)
Secure stools under light table shelves with straps.
(8)
Prepare camera for shipping by doing the following:
(a)
Install red holddown bars on copyboard.
(b)
Move lenseboard up with bellows compressed.
(c)
Close and secure top of camera.
2-24