TM 5-3610-295-13&P-1SECTION III. OPERATION UNDER USUAL CONDITIONS2-14.ASSEMBLY AND PREPARATION FOR USE.a.SiteSelection.(1)Select a site where ground is firm, dry and has good drainage.(2)Level ground on which truck containing the Editorial Shelter will be parked.(3)For site selection for the complete MPS, refer to TM 5-3610-294-13&P.b.UnloadingShelter.(1)Loosen tiedown turnbuckles and remove sling hooks from transporter and tiedown rings.(2)Remove any blocking between shelter and transporter.(3)Install sling assembly to lifting eyes and lifting hook.(4)Tie a 1/2 inch (13 mm) rope at least 15 feet (4.6 meters) long to each rear shelter towing eye.(5)Position a man on each rope to assist in positioning shelter during lifting operation.2-15