TM 5-3610-294-13&P
SECTION III. SERVICE UPON RECEIPT OF EQUIPMENT
4-5. SETUP OF SHELTER. Refer to TM 10-5411-200-14 for shelter set up procedures.
4-6. SHELTER INVENTORY CHECK. Refer to TM 10-5411-200-14 for general shelter inventory checks.
4-7. SHELTER AND FINISHING SECTION INSPECTION CHECKLIST.
a.
Shelter Checklist. Refer to TM 10-5411-200-14 for shelter inspection checklist.
b.
Finishing Section Checklist. Table 4-1 below lists items in the Finishing Section that must be checked and the
action required.
Table 4-1. Finishing Section Checklist
ITEM
ACTION
1.
Power Distribution Panel
Check circuit breakers and switches for
damages or loose hardware.
2.
Emergency Light
Check for damaged or broken lights or
switches.
3.
Hygrometer
Check for broken indicators or glass cover.
4.
Islatrol Control Box
Insure that it is secure and no hardware is
loose or missing.
5.
Paper cutter
Refer to TM 5-3610-299-12&P, Paper Cutter
Operation and Maintenance manual for
inspection and check list procedures.
6.
Phase Monitor Meter
Inspect switches, lights and indicators for
damage.
7.
Thermostat
Inspect for damaged cover or broken
indicators.
8.
AC Units
Inspect switches, controls and vent assemblies
for damage.
9.
AC Ceiling Duct Assembly
Check for damaged air flow vents.
4-5