TM 5-3610-294-13&P
4-14. AIR CONDITIONER ASSEMBLY. - Continued
(23)
Carefully lay the unit face down on the ground.
(24)
Remove four nuts (4), washers (5), bolts (6), and air conditioner mounting bracket (1).
(25)
Lay replacement air conditioner face down on the ground.
(26)
Attach air conditioner mounting bracket (1) to bottom of air conditioner using bolts (6), washers (5), and nuts
(4).
NOTE
Make sure air conditioner is placed on fork lift so that front of air
conditioner will be facing cargo door entrance for installation.
(27) Move fork lift into position and raise air conditioner to upright position on fork lift tines. Tie a stiff wire to the
electrical cables to feed them through the electrical passage.
(28)
Lift air conditioner and move to installation site at shelter cargo door entrance.
(29)
Carefully guide fork lift forward and lower air conditioner on to lower mounting bracket assembly.
(30)
Guide fork lift away from shelter.
(31)
Align holes in air conditioner mounting bracket (1) with holes in lower mounting bracket assembly (2) and
secure with angle brackets (19, Figure 4-3), bolts (18), flat washers (17), lockwashers (16), and nuts (15).
(32)
Connect tee connector (21) to drain hose (22) and secure with tie strap (20).
(33)
Position intermediate duct (14) and secure with screws (13).
(34)
Reconnect the main power wires (11), grounding wires (10).
(35)
Cut and strip blue wire coming from transformer on replacement air conditioner. Reconnect thermostat wires
(9). Remove tags and install tie straps (12).
(36)
Position electrical cover (8) and secure with screws (7).
(37)
Position access cover (5) and secure quick release (4).
4-29