TM 5-3610-293-13&P
SECTION III. SERVICE UPON RECEIPT OF EQUIPMENT
4-5. SETUP OF SHELTER. Refer to TM 10-5411-200-14 for shelter setup procedures.
4-6. SHELTER INVENTORY CHECK. Refer to TM 10-5411-200-14 for general shelter inventory checks.
4-7. SHELTER AND PRESS SECTION INSPECTION CHECKLIST.
a.
Shelter Checklist. Refer to TM 10-5411-200-14 for shelter inspection checklist.
b.
Press Section Checklist. Table 4-1 below lists items in the Press Section that must be checked and the
action required.
Table 4-1. Press Section Checklist
ITEM
ACTION
1.
Power Distribution Panel
Check circuit breakers and switches for damages
or loose hardware.
2.
Emergency Light
Check for damaged or broken lights or
switches.
3.
Hygrometer
Check for broken indicators or glass cover.
4.
Islatrol Control Box
Insure that it is secure and no hardware is
loose or missing.
5.
Printing Press
Refer to TM 5-3610-304-20 for inspection and
check list procedures.
6.
Phase Monitor Meter
Inspect switches, lights and indicators for
damages.
7.
Thermostat
Inspect for damaged cover or broken indicators.
8.
AC Units
Inspect switches, controls and vent filter
assemblies for damages.
4-5