Changes in force: C2, C3, C4, and C5
TM 11-2323
*C5
TECHNICAL MANUAL
PROJECTORS PH-637/PFP AND PH-637A/PFP,
AND PROJECTORS, STILL PICTURE PH-637B/PFP AND
PH-637C/PFP
HEADQUARTERS,
TM 11-2323
DEPARTMENT OF THE ARMY
WASHINGTON, D.C., 9 September 1963
CHANGE No. 5
TM 11-2323, 7 April 1954, is changed as follows :
Note. The parenthetical reference to previous changes (example: "page
14 of C 4") indicates that pertinent material was published in that change.
Page 12, paragraph 10. Make the following changes: Delete
subparagraph b (Page 14 of C4) and substitute:
b. On the PH-637/PFP, PH-637A/PFP, and PH-637B/PFP,
open the carrying case by unlatching the two fasteners. On the
PH-637C/PFP, unlatch the four fasteners, and lift off the cover.
Add subparagraph c after subparagraph b).
c. See that the equipment is complete as listed on the packing
slip. If a packing slip is not available, check the equipment against
the basic issue items list (appx III). Report all discrepancies in
accordance with TM 38-750. Shortage of a minor assembly or
part that does not affect proper functioning of the equipment
should not prevent the use of the equipment.
CHAPTER 3
MAINTENANCE INSTRUCTIONS
OPERATOR'S PREVENTIVE MAINTENANCE
Section I.
35. Scope of Maintenance
The maintenance duties assigned to the operator of Projector
PH-637(*)/PFP are listed below with references to the para-
graphs covering the specific maintenance functions. The duties
*This change supersedes C1, 14 April 1959.
1